UK · Price guide

How Much Does a Kitchen Refit Cost in the UK?

Typical range

£8,000 — £16,000

A full kitchen refit — new units, worktops, appliances, plumbing and electrics — typically runs £8,000 to £16,000 in the UK. Bespoke cabinetry, stone worktops and moving services push costs higher.

Check your own quote →

What this estimate assumes

A mid-range 10–15-unit kitchen refit in the existing room, with the main plumbing and appliance positions retained and standard branded appliances included.

The published range describes a mid-range refit, not a cosmetic door swap or bespoke kitchen. London labour and premium worktops can take a similar layout beyond £16,000.

Typical cost breakdown

Cabinets and fittings
£3,000–£6,000
Worktops
£600–£2,500
Appliances
£1,500–£3,500
Installation and trades
£2,500–£5,000

Usually included

  • Removal and disposal of the old kitchen
  • Mid-range units, doors, handles and laminate or entry-level stone worktops
  • Standard appliances and straightforward service connections
  • Fitting, plumbing, electrical adjustments and basic making good

Usually costs extra

  • Structural wall removal or an extension
  • Bespoke cabinetry and premium stone
  • Major rewiring, a new boiler or extensive pipe relocation
  • Flooring and full-room decoration unless itemised

What affects the price

  • Cabinetry tier — flatpack vs rigid vs bespoke
  • Worktop material (laminate, quartz, granite)
  • Whether appliances are included
  • Moving plumbing, gas or electrics
  • Regional labour rates — London 20–30% higher

Red flags to watch for

  • No itemised quote for units, worktops, appliances and labour
  • No written completion date or payment schedule
  • Cash-only with no VAT invoice

Questions to ask your provider

  • Can I see an itemised breakdown of units, worktops and labour?
  • Who orders and warranties the appliances?
  • What is the payment schedule?
  • How will you protect the rest of the house during works?

Frequently asked questions

How long does a kitchen refit take?

Typically 2–4 weeks for a standard refit, longer if walls or services are being moved.

Do I need planning permission?

No, not for a like-for-like refit inside the existing footprint.

Are appliances normally included in a kitchen quote?

It varies. Ask for model numbers, supply prices, installation and warranties to be listed, or mark them as client-supplied.

What causes kitchen projects to run over budget?

Hidden wiring or plumbing issues, late layout changes, damaged walls and worktop templating delays are common. Keep a contingency and agree how variations will be priced.

Sources and methodology

Reviewed 27 September 2026. Prices vary by specification, access, materials and local labour rates.

Read the full FairPrice methodology